STP

Sewage Treatment Plant

Municipal & Commercial Sewage Treatment — BNBC & DoE Compliant

Hydro Engineering Solutions designs and builds Sewage Treatment Plants for residential towers, commercial developments, industrial campuses, and municipal schemes — engineered to meet Bangladesh National Building Code (BNBC) and DoE discharge standards.

Capacity Range

10 – 2,000 m³/day

Treatment Process

ASP · SBR · MBBR · UASB

Compliance Target

DoE ECR 2023 · BNBC

Sectors Served

Residential · Commercial · Municipal

Documentation

Full DoE & Rajuk package

Support

AMC lifecycle contracts

How It Works

Multi-stage sewage treatment process

Each STP is designed around your facility's population equivalent, hydraulic load, and site constraints — ensuring stable, compliant discharge from day one of commissioning.

01

Preliminary Treatment

Coarse and fine screens remove solids, rags, and grit that would damage downstream equipment. A grit chamber separates inorganic material before the sewage enters primary treatment.

02

Primary Settling

Sewage flows into a primary clarifier where settleable solids separate under gravity, forming primary sludge. This stage removes 50–70% of suspended solids and 25–40% of BOD before biological treatment.

03

Biological Treatment

Aerobic microorganisms break down dissolved organic matter. Technology selection — ASP, SBR, MBBR, or UASB — is matched to your capacity, footprint, and treated-water reuse requirements.

04

Secondary Clarification

Biological sludge is separated in a secondary settler. Return activated sludge (RAS) maintains biomass concentration; waste activated sludge (WAS) is sent to sludge handling.

05

Tertiary Treatment

Sand filtration, activated carbon, or membrane polishing removes residual turbidity and pathogens. Disinfection (UV or chlorination) brings treated effluent to safe discharge or irrigation reuse standards.

06

Sludge Dewatering

Sludge from primary and secondary stages is thickened, dewatered by filter press or centrifuge, and disposed of or composted in accordance with DoE waste management regulations.

Applications

Where STP is required

Bangladesh building regulations require STP installation in residential buildings above a certain floor count, all commercial developments, and any facility discharging to a municipal drain or water body.

High-rise Residential

Apartment complexes and condominiums where municipal sewer connection is unavailable or insufficient for the population load.

Commercial Complexes

Shopping malls, hotels, hospitals, and office towers requiring compliant sewage management under Rajuk and DoE permits.

Industrial Campuses

Factory townships, export processing zones, and industrial parks generating domestic sewage alongside process effluent.

Municipal Schemes

WASA and city corporation sewage treatment schemes serving residential and mixed-use zones under government infrastructure programmes.

Educational Institutions

Universities, schools, and residential campuses requiring integrated sewage management for large student populations.

Healthcare Facilities

Hospitals and clinics where sewage contains pathogens and pharmaceutical residuals requiring enhanced disinfection treatment.

Technical Specifications

Design parameters

Parameter Typical Range
Treatment Capacity 10 – 2,000 m³/day
Inlet BOD 150 – 400 mg/L
Outlet BOD ≤ 30 mg/L (DoE limit)
Inlet COD 300 – 800 mg/L
Outlet COD ≤ 100 mg/L (DoE limit)
Inlet TSS 150 – 350 mg/L
Outlet TSS ≤ 50 mg/L (DoE limit)
pH (treated) 6.5 – 8.5
Faecal coliform ≤ 1,000 MPN/100 mL
Retention time 8 – 24 hours (process-dependent)

All parameters subject to site-specific design and inlet characterisation.

Why Hydro Engineering Solutions

Engineering built for Bangladesh's compliance landscape

Rajuk & DoE documentation

We prepare the full regulatory package including process design drawings, environmental impact assessments, and operational manuals for permit approval.

Compact footprint options

Where basement or rooftop space is limited, we engineer MBBR-based systems that achieve the same treatment performance in a fraction of the conventional plant area.

Treated water reuse design

Our STP designs can incorporate a treated water reuse circuit for toilet flushing or irrigation — reducing potable water consumption and operating costs.

O&M training included

We train your facility management team to operate and maintain the STP competently — reducing your dependence on expensive third-party operators.

Get Started

Ready to discuss your STP requirements?

Share your facility details, population equivalent, and regulatory requirements. Our engineers will respond within one business day with a no-obligation proposal.

  • ✓ Population equivalent and flow rate assessment
  • ✓ Technology selection matched to your site constraints
  • ✓ Rajuk and DoE documentation support
  • ✓ Treated water reuse options

Request a Free Consultation

No obligation. Our engineering team responds within 1 business day.

WhatsApp Call Now